N.2 Boilers
Maker: Bono
Year: 2010
Capacity: 10 ton/h each
Working pressure: 12 bar each
Fuel: natural gas CH4 (methane) or diesel
With economizer
Electrical panel with PLC
This two boilers are currently in operation: one will become available in September 2024, the other one in July 2025.